Get All The Data You Need To Meet Production Goals With Visual Intelligence

Meridian Power Systems x Leela — ArUco Job Tracking demo
Meridian Power SystemsTransformer Assembly LinePowered by Leela
Live Monitoring — ArUco Job Tracking
TRACKING JOB PROGRESS
Stations active4
Job orders in progress4
1Tracking job progress via ArUco codes at each station

Meridian Power Systems

Transformer Assembly Line · Station Cycle Time & Scheduler Dashboard

 Line Transformer Assembly
📅 Jun 1 – Aug 31, 2026  (Trailing 3 mo)
Stations 1–4
Station Cycle Time & Labor Input
Stations on Line
4
Manual assembly stations 1–4
Operators on Line
5
1–2 per station, by task
Avg Cycle Time of Record
1h 06m
Design/standard time, line avg
Avg Actual Cycle Time
0h 56m
Measured via ArUco, trailing 3mo
Avg Deviation (Line)
−15 %
Actual vs. record, line avg
Worst Station
+63 %
Station 2 · running well over cycle time of record
Actual vs. Cycle Time of Record, by Station
StationRecordAvg ActualDeviation
Station 11h 00m0h 48m−20%
Station 20h 48m1h 18m+63%
Station 31h 30m0h 54m−40%
Station 41h 06m0h 43m−35%

Cycle time: record vs. actual (3mo avg)

Hours:minutes per unit, by station

0 50m 100m St. 1 St. 2 St. 3 St. 4
Cycle time of recordAvg actual
Feeding the Scheduler
How it's used

Actual cycle time sets takt, not the spec sheet

The line scheduler paces new jobs off each station's trailing 3-month average actual cycle time — not the original cycle-time-of-record — so the schedule reflects how the line really runs, including Station 2 running well over its cycle time of record.

StationAvg ActualDeviationScheduled Takt
Station 10h 48m−20%1h 00m
Station 21h 18m+30%1h 00m
Station 30h 54m−10%1h 00m
Station 40h 43m−35%0h 45m
2Cycle time & scheduler dashboard
1 · ArUco job tracking 2 · Dashboard
0:00 / 0:00

 Deliver to schedules based on actual cycle times and measure labor input to optimize scheduling.